17 Toulambi Street, Noosa Heads
Site Entry Terms & Requirements
Before entering this site, please read the following terms and submit the form at the bottom of this page prior to entry.
PROJECT DESCRIPTION: Landscape and Deck Renovations
SERVICES.
Elec: Minor electrical work for pool pump relocation
Gas: No change to gas. Caution regarding existing gas lines during demo works
Sewer: No changes to existing sewer/septic
Stormwater: NA
Water: NA
NBN:NA
Other: Assessment will be required prior to any work being done.
SITE SPECIFIC RISKS / CONTROLS:
Toilets provided on site
Other staff members on site during the day
Demolition work with excavator, caution and communication needed
Exit gates to be shut in afternoon
Ensure full site clean each day
No extra controls over those in SWMS.
KEY TERMS OF ENTRY
We emphasize the utmost respect not only towards our team members but also towards our valued clients and their neighbors. Adherence to site rules is imperative, and non-compliance may result in removal from the site.
– You have read and agree to the site safety rules (see QR code on board).
– All safety incidents, near misses, injuries must be reported to Built by Athena.
– In the event of an incident please leave site and head to the muster point outside the site entrance.
Minimum P.P.E for the site:
– Site safety boots
– Safety glasses
– Other P.P.E as required by the task being completed.
The site must be left tidy at the end of the day. All rubbish to be placed in skips provided.
NOTE: In the site safety box (blue box) you will find basic PP.E equipment, first aid kit and a fire extinguisher.
SUBCONTRACTORS & SUPPLIERS OBLIGATIONS: In entering this site you agree to:
– Have SWMS covering your works. These must be readily available for review.
– Provide and wear the required P.P.E for your works.
– Complete all works in a safe manor.
– Communication any high-risk activities with others working on the site prior to starting these works.