Site Entry Terms & Requirements

Before entering this site, please read the following terms and submit the form at the bottom of this page prior to entry.

Project Details:

Job Name: 98 Tunba Court, Cooroy Mountain

Project Description: General renovation

Principal Contractor: Built by Athena (Athena Services Group Pty Ltd)

Local Authority: Noosa Council

Internal and external renovations including:

  • New kitchen cabinetry
  • New bathrooms and laundry, including tiling and fixtures
  • Internal and external painting
  • Timber deck renovations
  • Swimming pool renovations
  • Roof restoration works

2. Services on Site

Electrical

  • Switchboard upgrade required
  • Replace lights where needed
  • Hard-wired appliances (oven, cooktop, dishwasher)
  • Temporary isolation required during works

Plumbing

  • Removal and replacement of:
    • Toilets
    • Vanities
    • Showers and floor wastes
  • Waterproofing to wet areas (AS 3740 compliant)

Water

  • Temporary isolation during bathroom/kitchen works

Stormwater

  • No new stormwater works noted (internal refurbishment only)

3. Site-Specific Risks & Controls

Key Risks Identified

  • Internal demolition works
  • Silica dust from tile removal and cutting
  • Manual handling of tiles, cabinetry, appliances
  • Electrical works
  • Plumbing works and temporary water isolation
  • Slips, trips and falls from:
    • Uneven surfaces
    • Removed floor finishes
    • Wet areas during waterproofing
  • Falling objects during demolition and overhead works
  • Confined internal work areas

Controls

  • All demolition as per SWMS
  • Dust suppression and silica controls (cutting wet, PPE)
  • Exclusion zones during demolition
  • Isolation of electrical and water services prior to works
  • Manual handling aids and team lifts
  • Temporary edge protection / controlled access to balconies
  • Clear access paths maintained
  • Daily site clean-up

4. Other Site Conditions

  • Steep driveway caution
  • Respect for neighbours required at all times

5. Amenities

  • Toilet provided on site
  • First aid kit on site
  • Fire extinguisher on site

6. Minimum PPE

  • Steel cap boots
  • Safety glasses
  • Task-specific PPE as required (hearing protection, respirators, gloves)

7. Key Terms of Entry

  • Site induction required (QR code)
  • Follow SWMS at all times
  • Report all incidents, near misses and injuries to Site Supervisor
  • Keep site tidy – rubbish to skips provided
  • No unauthorised access
  • Respect neighbours and common property

SUBMIT COMPLETED FORM PRIOR TO ENTERING SITE